Online Risk Register

Suboptimal design of well leads to reduced flow rate

Any issue leading to an actual well production below the targeted flow rate, including wrong well shape and resource underestimation.

Informations

  • Category: Risks due to internal deficiencies
  • Id: C-2
  • Phases:
    • Drilling / Testing
  • Consequences:
    • Economic / Performance / Acceptability

Mitigation

  • Prevention:
    • Select experienced staff for well design
  • Corrective measures:
    • Drill a new well

More information is available on the project deliverable (link), or navigate on the online version.

The colors represent a computation of typical percentage of answers expected for each cell in the risk matrix. The numbers in each cell represent the actual answers from the risk survey. More details about this computation can be found here. The numbers in each cell represent the actual answers from the risk survey.