Online Risk Register

Fluid chemistry/ gas content / physical properties change

Reservoir fluid composition, gas content and other physical properties can change through time during operation due to gas or component extraction within the produced fluid (e.g. Li, gases), due to injection of inhibitors and chemicals used to treat corrosion and scaling or because of thermal and pressure changes in the reservoir. This risk is generally accounted for during management plan of the field ahead of the project and is closely monitored over time by analysing fluid composition and gas content.

Informations

  • Category: Risks due to subsurface uncertainties
  • Id: D-8
  • Phases:
    • Exploitation / Development
  • Consequences:
    • Economic / Performance / Acceptability
    • Health / Safety / Environment

Mitigation

  • Prevention:
    • Thorough reservoir management plan
  • Monitoring:
    • fluid sampling and analysis
  • Corrective measures:
    • Remediation plan to understand phenomena and control it

More information is available on the project deliverable (link), or navigate on the online version.

The colors represent a computation of typical percentage of answers expected for each cell in the risk matrix. The numbers in each cell represent the actual answers from the risk survey. More details about this computation can be found here. The numbers in each cell represent the actual answers from the risk survey.