Online Risk Register

Fluid losses leading to severe technical issues

Mud pressure higher than minimum principal stress around the borehole inducing losses of drilling fluid, slurry or treatment fluid containing solid particles into the formation. This can lead to reservoir damages and/or drilling blind with no cutting coming up anymore to gives information on the formation encountered

Informations

  • Category: Technical issues
  • Id: E-1
  • Phases:
    • Drilling / Testing
  • Consequences:
    • Economic / Performance / Acceptability
    • Health / Safety / Environment

Mitigation

  • Prevention:
    • Avoid extreme overpressure drilling
    • Proper composition and parameters of drilling fluid /mud program/
  • Monitoring:
    • Pressure and flow rate monitoring
  • Corrective measures:
    • Ciment the well in the area of fluid losses

More information is available on the project deliverable (link), or navigate on the online version.

The colors represent a computation of typical percentage of answers expected for each cell in the risk matrix. The numbers in each cell represent the actual answers from the risk survey. More details about this computation can be found here. The numbers in each cell represent the actual answers from the risk survey.