Includes failure of subsurface equipments, surface equipment (eg. heat exchangers,valves, pipes) and other elements of the surface infrastructure. The failure can lead to a prolonged breakdown and other downtime; a severe scenario is when frost provokes the failure, and the plant is not able to provide heat to customers.
More information is available on the project deliverable (link), or navigate on the online version.